Latest Activity

code

Scheduling Jobs in Denodo using BMC Contol-M (without using the Denodo Scheduler)

I am using Version 6.0 (update 12192016) on RedHat Linux. I need to use Control-M with Denodo - to run jobs in Denodo to populate the Cache engine tables. Can I use ODBC to connect from Control-M to to Denodo to run VQL scripts to run Base/Derived Vi...

Denodo Scheduler 6.0 wrapper contol-M